Submit an Article

If you've got some news that’s not listed here then you can add it easily by clicking the link below.

Submit your article

Related Articles

New Categories

Archive

News

Swindon's Mechanics Institute in the top ten of the Theatre Buildings at Risk register 2009

The Mechanics Institute is perhaps one of the finest surviving examples of its kind.

Designed in Tudor Gothic style of Swindon limestone rubble with Bath ashlar dressings, externally it gives the appearance of a great hall with buttressed sides of eight bays.

It was built by GWR as a social and community centre for staff, opening in 1855, with a library, coffee room, reading room etc. It had a lecture/concert hall with a stage. There was originally an octagonal market hall at the south end. A proposal to erect a full-scale theatre at the rear in 1878 never came to fruition. In 1892 the market hall was demolished and the Institute greatly enlarged. These and most later additions and alterations were carried out in matching style.

In 1930 the centre of the building was badly damaged by fire. The first floor hall was rebuilt as a theatre, the Playhouse, later known as the Civic Playhouse, with an enlarged stage. It had pit, stalls and dress circle, a pretty theatre with an elaborate proscenium and (unusually for its kind) a fly tower. The Playhouse took the place of the Empire, when that turned to cinema and also served local amateur companies who were later accommodated at the Wyvern.

The theatre closed in 1986 and has since been disused and in some disrepair. In 1990 planning permission was granted (on appeal) for conversion to an hotel, but this had not been implemented by 1999.

Source: The Theatres Trust

for further details visit http://www.theatrestrust.org.uk/resources/theatre-buildings-at-risk-2009

Share this Story

Comments

Be the first person to respond

Leave a Comment

Your email will not be published and is used for moderation purposes only.

Required fields are marked with a *




Search the Directory

The Directory aims to comprehensively map all theatre and theatre-related activity in our area.

Use the form below to search the directory.



Join the Directory

Raise your profile and platform your theatre practice by listing in the Directory.

If you live or work in our area then you can list yourself now for free.